THE ONLINE RESULT FRAMEWORK DATABASE
Vietnam Irrigated Agricultural Improvement Project (VIAIP) - WB7
Home
Introduction
Report
Objective Indicators
Finance & Contracts
Result Table
Documents
PAD
M&E Handbook
Database Guide
CMS
Indicator Search Engine:
P1-Direct project beneficiaries (HHs)
P2-Area provided with irrigation and drainage services - Improved (Hecta )
P3-Water users provided with improved irrigation and drainage services (Number )
P4-Water users (male) provided with improved irrigation and drainage services (Number )
P5-Water users (female) provided with improved irrigation and drainage services (Number)
P6-Farmers in scheme area adopting improved production techniques (HHs)
P7-Operational water users association created or strengthened (Number)
HP1.1-Each province develops and annual modernized irrigated agricultrure plans (Number)
HP1.2-Improved performance of IDMC ()
HP1.3-WUA - PIM agreements established and implemented (Number of services contract )
HP1.4-Percentage increase in WUA assessing service delivery by IDMC as satisfactory (% WUA)
HP2.1-Area provided with irrigation and drainage services - Improved (Hecta)
HP2.2a-Yield of Paddy (winter- spring) (Ton per Hecta)
HP2.2b-Yield of Paddy (summer, summer-autum) (Ton per Hecta)
HP2.2c-Yield of Maize (Ton per Hecta)
HP2.2d-Yield of Orange (Ton per Hecta)
HP2.3-Increase in irrigation intensity (%)
HP3.1-Seasonal farmers field school (FFS) eatablished (Number)
HP3.2-Area under ICM cultivation in scheme commands (Hecta)
HP3.3-New cropping systems with new technologies (Number)
HP3.4-Area under drip irrigation (Hecta)
Filter Condition
Actual & plan chart
Actual of all provinces
Actual & plan chart of province
Actual & plan chart of project
Ha Giang
Phu Tho
Hoa Binh
Thanh Hoa
Ha Tinh
Quang Tri
Quang Nam
A half year of report
Yearly report
2020
2019
2018
2017
2016
2015
Download
Excel
Pdf